DCI Partners Announces Data Center San Felipe — 80 MW Development Outside Santiago
A strategically positioned development connecting Chile to Argentina and the Atlantic markets, with a unique disaster recovery proposition for the region.

A Distinct Connectivity Profile
DCI Partners has announced the development of Data Center San Felipe, an 80 MW IT capacity data center (100 MW maximum site build-out) located in the Aconcagua Valley, approximately 90 kilometers north of Santiago. The site spans 34.6 acres (14 hectares) and is positioned 500 meters from the San Felipe electrical substation, with multiple international trunk fiber systems running in front of the site along Ruta 60.
Unlike data centers concentrated in the Santiago metropolitan corridor, Data Center San Felipe sits directly on the trunk fiber route that connects Chile to Argentina and onwards to the Atlantic submarine cable systems. This gives tenants at San Felipe a dual-market reach — Pacific-facing connectivity through Chile’s established west coast cable infrastructure, and direct eastbound access to the Argentine market and Atlantic systems — from a single Chilean location. For hyperscale operators, cloud providers, and enterprises that need to serve both South American coasts or require low-latency connectivity into Buenos Aires and the broader Argentine market, San Felipe offers a connectivity advantage unavailable in the Santiago data center corridor.
Chile’s Premier Disaster Recovery Location
San Felipe is located outside the Santiago Metropolitan Region — a distinction that matters significantly for enterprise and institutional tenants who require true infrastructure independence for their disaster recovery deployments. A seismic event, grid disruption, or operational failure affecting the Metropolitan Region does not impact San Felipe operations. This geographic separation, combined with its own dedicated substation access and independent fiber routes, positions the site as the natural DR anchor for organizations that currently rely entirely on Santiago-area data center capacity.
80 MW IT / 100 MW maximum site build-out
34.6 acres (14 ha) / 500m from San Felipe Substation
Multiple international trunk fiber systems on Ruta 60

Room to Scale — Without Competition
The Aconcagua Valley remains free of the data center congestion that increasingly characterizes the Santiago market, where competing developers are competing for limited power capacity, fiber access, and permitting approvals in a tightening corridor. In those environments, projects risk delays and may struggle to reach full capacity. San Felipe carries none of those constraints. As a greenfield development in an uncrowded market with direct substation access and established international fiber routes, DCI Partners can develop the full 80 MW IT program without competing against other operators for the same limited infrastructure.
Site Details — Capacity: 80 MW IT / 100 MW maximum site build-out. Site Area: 34.6 acres (14 ha). Substation: 500m from San Felipe Substation. Fiber: Multiple international trunk fiber systems on Ruta 60. Access: Within 100 km and approximately 1.5 hours’ drive from Santiago’s Arturo Merino Benítez International Airport. Status: In Registration. For inquiries regarding Data Center San Felipe, contact DCI Partners at info@dci-partners.com.
